Selected projects

Mechanical scope, delivered in demanding environments.

Published Lou Brock Mechanical work, rebuilt here as an image-led project archive with the original project facts kept intact.

Healthcare

BJC Campus Renewal South Tower

BJC renovated the 360-bed Children’s Hospital. Lou Brock Mechanical’s published scope included five approximately 65,000 CFM air handlers, hoisting and assembly, set and connect work, and shell/core mechanical scope.

Magnitude > $2,000,000
Higher education

Saint Louis University Pius Library

Work covered the Special Collections and Applied Technology Center projects, including chilled/hot water piping, a roughly 45,000 CFM air handler, pumps, insulation, and a redundant Liebert system for Special Collections.

Magnitude > $1,000,000
Historic renovation

Mendenhall Mixed-Use Development

A four-story historic building renovation. The mechanical scope was bid plan-and-spec, then value engineered during post-bid to solve for building needs and budget while protecting the exposed-ceiling aesthetic.

Magnitude > $600,000
Healthcare

Missouri Baptist Chiller Tower Rehab

The project addressed aging underground piping and pumps serving the cooling towers and mechanical room, with a tightly coordinated schedule that kept the hospital functional.

Magnitude > $450,000