Selected projects

Mechanical scope, delivered in demanding environments.

Published Lou Brock Mechanical work, rebuilt here as an image-led project archive with the original project facts kept intact.

Project details reflect Lou Brock Mechanical’s published portfolio. Photography in this concept is representative.

Healthcare

BJC Campus Renewal South Tower

BJC renovated the 360-bed Children’s Hospital. Lou Brock Mechanical’s published scope included five approximately 65,000 CFM air handlers, hoisting and assembly, set and connect work, and shell/core mechanical scope.

Magnitude > $2,000,000
Higher education

Saint Louis University Pius Library

Work covered the Special Collections and Applied Technology Center projects, including chilled/hot water piping, a roughly 45,000 CFM air handler, pumps, insulation, and a redundant Liebert system for Special Collections.

Magnitude > $1,000,000
Historic renovation

Mendenhall Mixed-Use Development

A four-story historic building renovation. The mechanical scope was bid plan-and-spec, then value engineered during post-bid to solve for building needs and budget while protecting the exposed-ceiling aesthetic.

Magnitude > $600,000
Healthcare

Missouri Baptist Chiller Tower Rehab

The project addressed aging underground piping and pumps serving the cooling towers and mechanical room, with a tightly coordinated schedule that kept the hospital functional.

Magnitude > $450,000
Next project

Bring Lou Brock Mechanical into the scope early.

Start a conversation